Connections House
Third Floor Expansion! We are so excited to show you some photos of the expansion to our third floor! The foundation has been laid for the new commercial kitchen/dining hall and the firepit has been moved to its new location on the open, upper patio. Next week all the supports will be taken down on the second floor. What’s Next? There are two things on the list of what comes next - railings and block walls. Two of the walls for new building will be made of block. Once those are in place, the metal studs that have already been donated can be put up to finish the walls for the building. As soon as possible, we would like to get railings put up on the third floor for safety. The fire pit is ready for use, however some teams, especially those with children, will not be able to use it until railings are installed. ...